Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    The News CartelThe News Cartel
    Subscribe
    • Home
    • Business
    • Lifestyle
    • Entertainment
    • Education
    • National
    • Health
    • Technology
    • Finance
    • World
    • News
      • Ahmadabad
      • Amreli
      • Anand
      • Aravalli
      • Banaskantha
      • Bharuch
      • Bhavnagar
      • Botad
      • Chhota Udepur
      • Dahod
      • Dangs
      • Devbhumi Dwarka
      • Gandhinagar
      • Gir Somnath
      • Jamnagar
      • Junagadh
      • Kachchh
      • Kheda
      • Mahesana
      • Mahisagar
      • Morbi
      • Narmada
      • Navsari
      • Panchmahal
      • Patan
      • Porbandar
      • Rajkot
      • Sabarkantha
      • Surat
      • Surendranagar
      • Tapi
      • Vadodara
      • Vapi
    The News CartelThe News Cartel
    Home»Business»Rustom Kerawalla’s VIBGYOR Group of Schools going Green with the installation of solar panels at its VIBGYOR High school at Electronic City, Bengaluru
    Business

    Rustom Kerawalla’s VIBGYOR Group of Schools going Green with the installation of solar panels at its VIBGYOR High school at Electronic City, Bengaluru

    Shruti JoshiBy Shruti JoshiDecember 25, 2023No Comments2 Mins Read
    Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Email
    0 0
    Read Time:1 Minute, 12 Second

    New Delhi (India), December 25: Rustom Kerawalla’s VIBGYOR Group of Schools going Green with the installation of solar panels at its VIBGYOR High school at Electronic City, Bengaluru.

    VIBGYOR Group of schools, a part of the Ampersand Group, has announced the successful installation and implementation of its pilot solar panel project at VIBGYOR HIGH, E-CITY, Bengaluru. 

    In keeping with United Nations Sustainable Development Goals, specifically UNSDG no. 7: ‘Affordable and Clean Energy’, VIBGYOR is committed to achieving lower carbon emissions and bringing cheap, reliable energy to its schools, by swapping traditional grid electricity supplies for solar power produced onsite. Efforts are underway to extend this green footprint across the entire network of 36 VIBGYOR schools pan-India.

    Installing such solar energy systems will allow schools to substantially reduce annual carbon emissions and can power multiple activities such as digital classboard teaching, computer lab activity and office operations. It can also be used in the library and the auditorium, as well as to light up school grounds. 

    As Rustom Kerawalla, Founder Chairman of Ampersand Group, opines, “The future is green. We owe it to our future generations to achieve a transition to clean energy. Indeed, it is about making an investment in our future.

    https://vgos.org/

    If you have any objection to this press release content, kindly contact pr.error.rectification[at]gmail.com to notify us. We will respond and rectify the situation in the next 24 hours.

    Share

    Facebook
    Twitter
    Pinterest
    LinkedIn

    About Post Author

    Shruti Joshi

    https://thenewscartel.com
    Happy
    Happy
    0 0 %
    Sad
    Sad
    0 0 %
    Excited
    Excited
    0 0 %
    Sleepy
    Sleepy
    0 0 %
    Angry
    Angry
    0 0 %
    Surprise
    Surprise
    0 0 %
    Business
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
    Previous ArticleVIRAASAT, Celebrating 75 handwoven Saris of India,  MySariMyPride, Exclusive Handloom Sari Exhibition at National Centre for Heritage Textiles, Handloom Haat Janpath, New Delhi
    Next Article “Revolutionizing Men’s Health: Tregma Healthtech Launches ManMedics, the First-Ever Doctors-Crafted Wellness Brand”
    Shruti Joshi
    • Website

    Related Posts

    Kredily 3.0 Launches KAI, Agentic AI for Payroll and HR, and Expands into AI-Powered Managed Payroll Services

    August 15, 2026

    Kredily 3.0 Launches KAI, Agentic AI for Payroll and HR, and Expands into AI-Powered Managed Payroll Services

    August 15, 2026

    Jinkushal Industries Limited Announces Unaudited Financial Results for the Quarter Ended June 30, 2026

    August 15, 2026

    Average Rating

    5 Star
    0%
    4 Star
    0%
    3 Star
    0%
    2 Star
    0%
    1 Star
    0%
    (Add your review)
    © 2026 ThemeSphere. Designed by ThemeSphere.

    Type above and press Enter to search. Press Esc to cancel.